I-84, Karcher Interchange to Five Mile Environmental Study

   
  

Description

   
An environmental document was prepared for the Karcher Interchange to Five Mile Road segment in accordance with the National Environmental Policy Act (NEPA). An environmental document is a full-disclosure document detailing impacts of the proposed improvements to the human and natural environment. The Federal Highway Administration issued a Finding of No Significant Impact (FONSI) in April 2009.

The study limits extend from the Karcher Interchange in Nampa to the Five Mile Overpass in Boise. This section of I-84 is primarily a four-lane divided highway in Canyon County and an eight-lane divided highway in Ada County. With the addition of the new Karcher Interchange, there are currently six interchanges. A seventh interchange at Ten Mile Road is expected to begin construction in July 2009.

The comprehensive study will allow ITD to develop possible alternatives for highway improvements. Several scientific studies including a noise and air quality analysis, along with traffic, structure and geotechnical studies were conducted. The environmental document also includes:


  • A long-term improvement plan that defines a comprehensive package of recommendations for managing and improving the transportation system in the study area.
  • A conceptual plan that identifies design options for the interstate mainline and existing interchange.
  • Environmental documentation that identifies the impacts the proposed improvements may have to the human and natural environment.
  • A preferred alternative that was selected based on a comprehensive evaluation of environmental impacts, cost, engineering aspects and public opinion.
  • Right-of-way requirements that will identify additional property near the project that will need to be purchased for future construction.

    The study included a collaborative involvement process with the public, local jurisdictions and property owners to determine the best options for improvement. Public meetings were held throughout the study process.
  •     

    Background

       
    Most of the Treasure Valley was rural when I-84 was first built in the late 1960s. Population growth and development since then are causing a rapid shift from a rural to suburban setting.

    The I-84 Corridor Study, completed by the Community Planning Association of Southwest Idaho (COMPASS) and ITD in 2001, identified long-term needs for the interstate. This environmental study will rely heavily on the recommendations of the 2001 study and will finalize the planning and design process for this section of the interstate corridor.

    The Communities in Motion: Regional Long-Range Transportation Plan for Southwest Idaho, adopted by the COMPASS Board in 2006, recommended maintaining and/or rebuilding existing interchanges to accommodate widening the interstate. It also recommended conducting a corridor-level alternatives analysis that would examine improvements such as High Occupancy Vehicle lanes, ramp metering and improvements to bus operations.
        

    Funding and Schedule

       
    The I-84, Karcher Interchange to Five Mile Environmental Study is funded with GARVEE bonds. ITD began the study in January 2007, and environmental clearance was gained through a finding of no significant impact (FONSI) in April 2009.
        

    Compliance with Title VI of the Civil Rights Act

       
    The Idaho Transportation Department (ITD) is committed to compliance with Title VI of the Civil Rights Act of 1964 and all related regulations and directives. ITD assures that no person shall on the grounds of race, color, national origin, gender, age, or disability be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any ITD service, program, or activity. The department also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. In addition, the department will take reasonable steps to provide meaningful access to services for persons with Limited English Proficiency.
        
     

    Contact

       

    GARVEE_Logo.jpg
    Contact
    comments@itd.idaho.gov
    Phone: (208) 334-4444
    TDD: (208) 334-4458
    ITD Projects Page

        
     

     

       

     

        
    Maximize 

    Environmental Assessment (EA)

       
        
    Minimize 

    EA Summary

       
        
    Minimize 

    Finding of No Significant Impact (FONSI)

       
        
    Maximize 

    Brochures/Postcards

       
        
    Maximize 

    Meetings/Hearings

       
        
    Maximize 

    News Releases

       
        
      Terms Of Use  Privacy Statement